| Value | Category | Cases | |
|---|---|---|---|
| 11 | Flush to piped sewer system | 31934 |
53.7%
|
| 12 | Flush to vailt (bayara) | 13090 |
22%
|
| 13 | Flush to septic tank | 10057 |
16.9%
|
| 14 | Flush to pipe connected to canal | 3994 |
6.7%
|
| 15 | Flush to pipe connected to Ground water | 141 |
0.2%
|
| 16 | Flush to somewhere else | 56 |
0.1%
|
| 17 | Flush, don't know where | 43 |
0.1%
|
| 21 | Ventilated improved pit latrine | 5 |
0%
|
| 22 | Pit latrine with slab | 28 |
0%
|
| 23 | Pit latrine without slab/open pit | 21 |
0%
|
| 31 | Composting toilet | 3 |
0%
|
| 41 | Bucket toilet | 27 |
0%
|
| 51 | Hanging toilet/hanging latrine | 2 |
0%
|
| 61 | No facility/bush/field | 9 |
0%
|
| 96 | Other | 80 |
0.1%
|